Free demo · no sign-up

Migrate legacy infra

Sample numbers prefilled. Change any input to see NPV, FVI, and payback update live.

$

How much value does this feature create per year? (revenue, saved cost, or both)

$

Rough one-time investment: engineering time + design + rollout.

How many years of lift do you count? 3 is the CFO-friendly default.

60%

Haircut applied to expected lift when computing FVI.

NPV (undiscounted)

$0

$120,000 lifetime lift − $120,000 build cost

FVI (confidence-weighted)

0.60

Higher = better. Score >1 means the confidence-adjusted lift beats the cost.

Payback

36 months

How long until annual lift covers the build cost.

Want to save this scenario, add more features, and build a full pitch?

Save & continue free

Save your scored memo

Email me this scenario as a memo

One-line verdict, the math, and the assumptions. Pasteable into Notion, Linear, or a CFO email. No account required.