Score one feature. See the math.

For product people: enter a yearly lift and cost, and see NPV, FVI and payback live. Free, no sign-up.

Display only, no conversion.

$

How much value does this feature create per year? (revenue, saved cost, or both)

$

Rough one-time investment: engineering time + design + rollout.

$

What it costs to run and maintain this every year, after it ships.

How many years of lift do you count? We default to 3.

70%

Haircut applied to expected lift when computing FVI.

Net benefit, before discounting

$400,000

$450,000 total benefit minus $50,000 build cost

NPV at 10%

$323,028

Future money is worth less than money today, so this is the number to compare options on.

FVI (confidence-weighted)

6.30

Higher is better. Yearly lift minus running cost, times years, times confidence, divided by build cost, with no units. Above 1 is our rule of thumb, not a standard. The framework guides use dollars per engineering week.

Payback

4 months

How long until annual lift covers the build cost.

Want to save this scenario, add more features, and build a full pitch?

Save it in a free account

The methods behind these numbers: what FVI means · RICE · cost of delay · presenting the result with SCQA